DESIGNING OF MATERIALS HANDLING EQUIPMENT


Voestalpine overhead crane 90-20t x 32mCrane construction

  • overhead cranes
  • gantry cranes
  • slewing gantry cranes:
  • level luffing cranes
  • derricks
  • special technological cranes
  • container cranes:
  • ship-to-shore cranes
  • rail mounted container gantry cranes (RMG)
  • ship unloaders:
  • ship-to-shore unloaders
  • ship loaders
  • cranes in nuclear power plants


Transport trolleys

  • simple trolleys
  • robotic


Load handling equipment

  • special telescopic spreaders
  • pulley blocks
  • C-hooks for sheet metal handling
  • crane ladles


Modernisation and modification of existing cranes

  • new hoisting mechanisms
  • new crane travel drives


Trash rack cleaning machines


Automatic manipulators


CONSULTING (ANALYSIS)


Supervisors for materials handling equipment

  • structural calculations
  • mechanical calculations
  • dynamic analyses
  • 3D simulations – drawings and calculations with motion simulation
  • control of documents